Floor covering replacement in Building A.
|
Removal of existing vinyl flooring and carpet which contains bonded ACM as listed on the School Asbestos Management Plan. Material currently undisturbed and in good condition.
|
|
|
Installation of new in-ground trampoline on the north side of the school
|
Removal of soil, which is assumed to contain bonded ACM fragments as listed on the School Asbestos Management Plan. Material currently undisturbed.
|
|
|
Replacement of floor coverings in the hallway of level 1 of Building A and 2 classrooms and the hallway of level 1 in Building B.
|
Removal of vinyl tiles known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|
|
|
Replacement of floor coverings in all rooms of Level 1 in Building 7.
|
Removal of vinyl tiles known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|
|
|
Student bathroom alterations in Building 5.
|
Removal of existing bathroom ceiling panels which contain bonded asbestos as listed on the School Asbestos Management Plan. Material is currently undisturbed and in good condition.
|
|
|
Replacement of lights in Building A and general power infrastructure work across the school.
|
Lights are within asbestos containing eave soffits surfaces as listed on the School Asbestos Management Plan. Material will not be disturbed.
|
|
|
Replacement of floor coverings in the Administration office and reception area of Building A and 2 classrooms and a storeroom in Building D.
|
Removal of vinyl tiles known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|
|
|
Replacement of eave lining on Building F.
|
Removal of eave lining known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|
|
|
Floor covering replacement in the classrooms of Building A
|
Removal of existing vinyl flooring which contains bonded ACM as listed on the School Asbestos Management Plan. Material currently undisturbed and in good condition.
|
|
|
Repairs to windows in Building A and Building E.
|
Removal of window infill sheeting known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|
|
|
Replacement of floor coverings in the classrooms and storerooms in Building E and a classroom and storeroom in Building I.
|
Removal of vinyl tiles known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|
|
|
Vinyl floor covering removal and ceiling panels replacement in the storeroom of Building B.
|
Removal of existing vinyl tiles and replacement of ceiling panels which contain bonded asbestos as listed on the School Asbestos Management Plan. Material is currently undisturbed and in good condition.
|
|
|
Boys toilets refurbishment in Building E.
|
Removal of known bonded asbestos from cubicle partitions as listed on the School Asbestos Management Plan. Material is currently undisturbed and in good condition.
|
|
|
Refurbishment of the administration staff room located in the demountable building next to Lane Street.
|
Removal of existing vinyl tile flooring which contains bonded asbestos as listed on the School Asbestos Management Plan. Material is currently undisturbed and in good condition.
|
|
|
Repair of ceiling linings in Building C.
|
Removal of ceiling linings known to contain bonded asbestos as listed on the School Asbestos Management Plan. Material is undisturbed and in good condition.
|